Common Installation Issues and Precautions for Padel Courts

Author: visits:74 Source:本站 Data:2020-11-14 21:13:58

description:

Common Installation Issues and Precautions for Padel Courts

Common Installation Issues and Precautions for Padel Courts


Foundation Stability


Issue: Improper foundation construction (e.g., insufficient depth, weak concrete mix) can lead to structural instability or tilting.


Precaution: Ensure precise alignment of anchor bolts and reserve electrical conduits during concrete pouring. Verify compliance with load-bearing requirements.


Component Assembly Sequence


Issue: Incorrect installation order (e.g., columns before crossbars) may cause misalignment or structural weakness.


Precaution: Follow the sequence in Fig. 3 (components layout) and use numbered parts from the packing list.


Tempered Glass Installation


Issue: Glass breakage due to improper handling or misalignment with ear plates (F1/F2).


Precaution: Install rubber pads (F7) under glass edges to absorb stress. Double-check glass orientation and alignment with connecting plates (F4-F6, F8-F9).


Mesh Frame Assembly


Issue: Loose or deformed mesh frames caused by incorrect accessories (e.g., F15, F16, F19).


Precaution: Securely fasten bolts/nuts and ensure square mesh spacing (50mm) as per specifications.


Light Post Connection


Issue: Weak electrical conduit integration or unstable mounting.


Precaution: Use specified accessories (F11, F17, F18) to fix light posts to the main frame. Confirm conduit预留 positions during foundation work.


Artificial Turf Installation


Issue: Uneven turf surfaces or improper quartz sand filling affecting ball bounce.


Precaution: Hire professionals for installation. Fill with 50-grit quartz sand evenly to stabilize turf fibers.


Net Tension and Alignment


Issue: Sagging or overly tight nets due to improper tensioning.


Precaution: Follow Fig. 18 for net installation. Use wire ropes (≤10mm diameter) and ensure center height (0.88m) with ±5cm tolerance.


General Notes:


Verify all bolts (e.g., M16 expansion bolts) are rust-proof and tightened to specified torque.


Conduct post-installation checks for verticality (≤1/100 tolerance) and frame straightness (≤50mm deviation).


Adhere to wind load calculations (1.82 kN/m²) and anchoring requirements to prevent structural failure in typhoon-prone areas.